Presentation: 17 September 2026. What will it take to power and cool the next wave of AI infrastructure? Start with the five findings below, then follow the slide references to the underlying evidence. The accompanying reading path connects this presentation to industrial siting, public disclosure and grid expansion. The original deck below contains the figures, assumptions and disclosures behind the analysis.

Original exhibits · Data table · Slide transcript · Research questions

Five findings to start with

  1. Electricity planning must match industrial scale. Collins compares prospective 2030 AI-driven power needs with the output of more than 60 AP1000 reactors. Slide 5.
  2. Efficiency does not eliminate infrastructure needs. Algorithmic and hardware improvements can accompany further physical expansion. Slide 7.
  3. Water impacts depend on place. Aggregate comparisons cannot settle the consequences of a large local user. Slides 20–21.
  4. Cooling choices change the accounting boundary. Onsite water requirements and electricity-generation water requirements deserve separate attention. Slides 22–23.
  5. The outlook has explicit uncertainties. Recursive learning, machine communication and distributed AI could change the resource picture. Slide 27.

Reading note: the 2027–2030 electricity series is a forecast. The map describes building records, not campuses. Water withdrawal and consumption are distinct measures.

It was a massive honor to present yesterday at the Rice University Water Institute’s “Water Nexus Conference 2026!”

These are special opportunities to share one’s own ongoing work and to then be able to learn 5 times as much from other folks who are super smart in their own respective subject areas. Here are the slides I delivered:

Three original exhibits

Slide 5: U.S. data center electricity use from 2000 to 2030, with 2025–2026 estimates and 2027–2030 forecasts; prospective 2030 AI power use is compared with the output of more than 60 AP1000 reactors.
Figure 1. U.S. data center electricity outlook. The source note distinguishes 2025–2026 estimates from 2027–2030 forecasts. The comparison with AP1000 reactor output illustrates scale; it is not a count of reactors under construction. Source: Gabriel Collins, Powering and Cooling the AI Boom in the United States, 17 September 2026, slide 5. Original source credits appear in the exhibit.
Slide 20: Contiguous U.S. data center building records mapped against annual precipitation normals and fiber routes. The August 2026 inventory distinguishes 2,054 active, 809 construction and 3,971 announced building records.
Figure 2. Climate and siting context. The August 2026 inventory, extracted 5 September 2026, maps 6,834 building records against 1991–2020 precipitation normals. Building records are not campuses, announced projects are not operating facilities, and precipitation does not measure available water supply. Source: Gabriel Collins, Powering and Cooling the AI Boom in the United States, 17 September 2026, slide 20. Original source credits appear in the exhibit.
Slide 23: U.S. thermoelectric water withdrawals compared with total and thermoelectric electricity generation over time; the axes have different units.
Figure 3. Water associated with electricity generation. This national historical comparison provides context for upstream water requirements. Withdrawals and consumption are different measures; the chart does not establish an individual data center’s marginal water footprint. Source: Gabriel Collins, Powering and Cooling the AI Boom in the United States, 17 September 2026, slide 23. Original source credits appear in the exhibit.

Read the reported numbers

YearGoogle electricity use (MWh)Google water withdrawals (acre-feet)Google Cloud revenue (million USD)Electricity / Cloud revenue (MWh per million USD)Water / Cloud revenue (gallons per million USD)
202015,138,54317,45913,0591,159435,638
202118,058,30019,32519,206940327,866
202221,586,40023,32426,280821289,193
202324,994,00026,55533,088755261,515
202431,713,90033,79243,229734254,713
202543,586,60045,07958,705742250,217
Table 1. Electricity, water withdrawals and cloud revenue as presented in September 2026

Source: Gabriel Collins, Powering and Cooling the AI Boom in the United States, 17 September 2026, slide 16. The slide credits company sustainability reports and the author’s analysis. Values and reported ratios are reproduced as shown; no current data have been substituted.

Scope: The electricity and withdrawal columns are Google-wide measures; the revenue denominator is the Google Cloud business segment. These are the author’s illustrative ratios across different measurement boundaries, not an estimate of water’s marginal price or an efficiency comparison with equal boundaries. Withdrawal is not the same as consumption. MWh means megawatt-hours; USD means U.S. dollars.

Original slide transcript

The transcript below preserves the extracted slide text. Consult the original PDF for figures, layouts and source notes; the selected exhibits and table above make additional visual information available on this page.

Full text of the slides (from the PDF)

Slide 1. Powering and Cooling the AI
Boom in the United States
Physics, Politics, and Tradeoffs
Gabriel Collins, J.D. | 17 September 2026

Slide 2. IMPORTANT NOTICE
Disclaimer & Disclosures
This presentation is provided for information and discussion purposes only. Consumers of the information and analysis contained in it make investments and take other actions at their own risk.
I am not a hydrologist, geologist, or engineer, and am not offering advice on technical aspects of any assets which may be discussed in this analysis. The information and opinions contained in, and expressed by, this analysis are based on sources I deem to be reliable. However, no warranty, assurance, or guarantee, express or implied, is made about the completeness, reliability, or accuracy of this content. Likewise, nothing in this presentation or the accompanying discussion creates an attorney-client relationship between us. I serve as a strategic advisor to Revive Water
Resources, LLC.
I have used Anthropic’s Claude and OpenAI’s ChatGPT to collect data and adversarially test my ideas and visually format the slides and Google’s Gemini to create some images.
The views expressed herein are my own interpretations as of the date of presentation, are made in my personal capacity, and are subject to change without notice.

Slide 3. AI and Water
Source: Steve Jones, The Guardian, 12
September 2026 https://www.theguardian.com/commentisfree/pictu re/2026/sep/12/steve-jones-pros-cons-aidatacentres-cartoon

Slide 4. The AI Boom: Historical
Perspective and What Likely
Comes in the Next 5 Years

Slide 5. ELECTRICITY
U.S. Datacenter
Electricity Use, 2030 AI-driven power use could equal the output of more than 60 AP1000 nuclear reactors
Sources: Koomey (2011); U.S. EPA (2007); Shehabi et al. (2024), LBNL-2001637;
Smith et al. (2026), LBNL-2001758 (Reference Case, 2025–2030); IEA (2025, 2026) and EPRI (2026) for cross-checks. Intermediate years interpolated; 2025–26 estimates, 2027–30 forecasts; author’s calculations.

Slide 6. BUILDOUT VELOCITY
How Do Hyperscale Datacenters Compare to Other
Industrial Assets?
Booms don’t usually accelerate as they near their peak. But datacenters are doing just that—and we do not even know where the peak might be.
Methodology: starting point is a judgment call on when true “industrial scale” development commenced; endpoint is the all-time historical peak figure.
Sources: U.S. Census Bureau (Hist. Stat. 1975, 1949); NBER/FRED (2026); USGS (Data Series 140, 2024); AISI (Ann. Stat. Rep.); U.S. Dept. of State (1814); Swank (1881, 1902); Fishbein (NARA, 1973); Kennedy (1859); Allen (JEH, 1979).
Steel production
CAGR, 1870–1944
Railroad mileage
CAGR, 1840–1916
Datacenter capacity
CAGR, 2000–2025
• Datacenter capacity shows big acceleration toward the back end of the curve, with capacity potentially doubling again between
2026 and 2030.
• The World War II steel surge relied heavily on capacity built 15– 20 years prior that was underutilized during the Depression, then surged during World War II. U.S. steel production, 1,000 short tons.

Slide 7. SILICON VALLEY’S OWN FORECAST
Can We Solve the Resource Input Problem With Algorithms and Efficiency?
Kind of…But Not Enough to Obviate Power & Cooling Needs
“We conjecture that in five years 10,000x more AI inference will be done worldwide, with these gains hypothetically coming from multiplicative progress of 50x in AI algorithms, 50x in system/hardware optimization/specialization, and 4x from further data center growth.”
50×
AI ALGORITHMS
× 50×
SYSTEM / HARDWARE
× 4×
DATA CENTER GROWTH
= 10,000×
MORE AI INFERENCE BY — Computing Research Association Ideas Dinner, 27
April 2026 https://cra.org/industry/2026/04/27/how-ai-will-reshape-computer-systems-by-2035-ajeffersonian-dinner-in-san-francisco-about-our-10000x-future/

Slide 8. Datacenters Are Located Throughout the U.S., But Are Likely to Cluster
Source: Baker Institute Center for Energy Studies, U.S. Data Centers and Infrastructure dashboard — https://www.bakerinstitute.org/dashboard-us-data-centers-andinfrastructure

Slide 9. AI Skepticism and How That Feeds Into Water and Electricity
Concerns

Slide 10. CAPABILITY TRAJECTORY
What Has AI Done For Me Lately? And What Could It Do
Tomorrow?
NOW NEXT
Frontier models in production, and inference already riding in the vehicle.
Next: discovery, diagnosis and materials science at machine speed.

Slide 11. PUBLIC OPINION
A Population
Increasingly
Skeptical—And It’s Remarkably
Bipartisan
Source: Ipsos, Artificial Intelligence: Key Insights, Data and Tables https://www.ipsos.com/en-us/artificial-intelligence-keyinsights-data-and-tables

Slide 12. PUBLIC OPINION
Perception of Skewed Benefits May Amplify
Salience of Environmental Concerns
Source: Ipsos, Artificial Intelligence: Key Insights, Data and Tables — https://www.ipsos.com/en-us/artificial-intelligence-key-insights-dataand-tables

Slide 13. Big jumps pre-dated the AI boom but psychologically, causation and correlation will be blurred and given the AI buildout trends, folks will assume the worst about coming power bills

Slide 14. What Does Datacenter Water & Power Usage Actually Look
Like?

Slide 15. POWER AND WATER
Key Hyperscale
Operators’ Global
Water Withdrawals
11×
In FY 2025, the City of Houston sold 11 times as much water as the biggest hyperscalers withdrew globally.
Source: City of Houston ACFR FY2025, https://houstontx.gov/controller/acfr/acfr-fy2025.pdf

Slide 16. POWER AND WATER
A Key Hyperscaler’s Water and Electricity Intensity vs.
The Value of Water
Google Electricity Use, MWh
Google Water
Withdrawals, AF
Google Cloud Revenue, Million USD MWh / Million $ Gal / Million $
Source: Company Sustainability Reports and Author’s Analysis
TRANSLATION: WHAT AN ACRE-FOOT OF WATER UNDERPINS
$1.3 million in revenue: what every acre-foot of water use now underpins
~$300,000 in economic activity per acre-foot fed into the City of Houston
< $500 generated per acre-foot used on a farm, in most cases

Slide 17. POWER AND WATER
How Do
Hyperscale
DCs Compare to Other
Industrial
Assets?
Industrial and infrastructure facilities: electricity load vs. water load, log scale.

Slide 18. PERSPECTIVE
Datacenter Approximate Power and Water Needs Versus
Petrochemical Plants

Slide 19. Water and Power Can Trade
Against Each Other

Slide 20. Climate Will Fundamentally Impact Cooling Choices…
6,834 building records mapped • August 2026 inventory • Contiguous U.S.
DATA CENTER STATUS
Active 2,054
Construction 809
Announced 3,971
Building records, not campuses.
Co-located buildings overlap.
Fiber-optic network
ANNUAL PRECIPITATION
1991–2020 normal • inches/year
Climate context—not water supply.
Baker Institute / Aterio · PRISM, OSU
Sources and methods in slide notes. Excludes Alaska, Hawaii and one record without coordinates. Extracted 5 Sep 2026. 20

Slide 21. Even Wetter
Climates Can Still
See Adverse
Impacts From Large, Hyperlocal Users

Slide 22. If I Air-Cool a Datacenter, Am I
Just Displacing Water Use Onto
The Grid?

Slide 23. What About The Water Footprint of Electricity
Upstream From Datacenters?
Source Note: Water use, withdrawal, and consumption estimates are compiled from the U.S. Geological Survey (USGS Circulars 1268, 1344, 1405, 1441; Fact Sheet 2018-3035; SIR
2019-5103; Professional Paper 1894-D;
Galanter et al., 2023; Harris et al., 2025; Skinner et al., 2025) and the National Renewable Energy
Laboratory (Macknick et al., 2011, NREL/TP6A20-50900). Historical and projected net electricity generation, fuel-mix transitions, and cooling-water data are drawn from the U.S.
Energy Information Administration (EIA Form923 Schedule 8, 2014–2024; Today in Energy briefs, 2018–2023; Annual Energy Review 2011;
Electric Power Annual 2024; Monthly Energy
Review, Aug 2026; Short-Term Energy Outlook, Sep 2026; and Annual Energy Outlook 2026).

Slide 24. Moving Toward Solutions

Slide 25. Datacenter
Developer
Investments in Water
Systems

Slide 26. The Money Is Going to Power More
Than Water

Slide 27. Where Might My Analysis Be Wrong?
1 Recursive training and learning—will the machines find a better way to train and run models than the brute force model we’ve been using for LLMs?
2 How will machines talk—will talking through mathematical weights be more efficient than using text and words?
3 Distributed AI—how might power and water use impacts change if more people use open-weight models and work on their own premises?

Slide 28. Thank You
Gabriel Collins, J.D.
Baker Institute for Public Policy bakerinstitute.org/expert/gabriel-collins
The Sinews of Civilization gabrielcollins.substack.com
17 September 2026

Slide 29. Further Reading Gabriel Collins on AI, datacenters, power, and water
1 of 2 ·
Are Data Centers Just Another Industrial Asset? 26 Aug 2026
Slides, AAPL West Texas Energy Institute · https://collinsresearchportal.com/2026/08/28/are-data-centers-just-another-industrial-asset/ What Happens to US LNG Exports if the Permian AI Build Really Takes Off? 20 Aug 2026
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/permian-ai-datacenter-gas-lng-exports
Datacenters Are Like Onions 6 Aug 2026
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/ai-datacenters-power-water-policy-solutions
The Data Center Industry Needs Its Own FracFocus-Style Transparency Initiative 2 Jul 2026
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/data-centers-fracfocus-transparency-computefocus
AI vs. Heavy Industry: How Do Datacenter Electricity and Water Loads Actually Compare? 13 May 2026
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/ai-datacenter-electricity-water-heavy-industry
When AI Data Centers Become Drone and Missile Targets 2 Mar 2026
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/when-ai-data-centers-become-drone
Texas AI Data Centers: Electric Grid Capacity Is a Bigger Challenge Than Water 19 Feb 2026
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/the-real-bottleneck-for-ai-infrastructure

Slide 30. Further Reading Gabriel Collins on AI, datacenters, power, and water
2 of 2 ·
In the Permian, Oil and AI Will Compete for Electricity 13 Feb 2026
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/in-the-permian-oil-and-ai-will-compete
The AI Race Is More Physical Than You Think 31 Dec 2025
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/the-ai-race-is-more-physical-than AI Geoeconomics: The Case for Bundling American Chips with Secure Electricity 19 Dec 2025
The Sinews of Civilization (Substack) · https://gabrielcollins.substack.com/p/ai-geoeconomics-the-case-for-bundling
AI Geoeconomics: Allied Electricity and Secure Data Centers 18 Dec 2025
Baker Institute working paper, with Christopher Bronk · https://doi.org/10.25613/T8RH-7H63
Recycled Water for Texas Data Centers: A Model Supply Agreement 12 Dec 2025
Texas Water Intelligence · https://texaswaterintelligence.com/2025/12/12/recycled-water-for-texas-data-centers-a-model-supply-agreement/ Could the Permian Basin Become America’s Next AI Data Hub? 15 Aug 2025
Baker Institute working paper · https://doi.org/10.25613/CDF1-4006

Original Source: https://gabrielcollins.substack.com/p/powering-and-cooling-the-ai-boom

Questions readers ask

Does air cooling eliminate a data center’s water footprint?

Air cooling can reduce onsite cooling-water demand, but a complete comparison also considers the electricity supplying the facility. The presentation’s national thermoelectric chart provides context rather than a site-specific footprint. Local conditions and the chosen system still need to be assessed. Powering and Cooling, slides 22–23.

How much land should a data center siting discussion allow for?

The companion August presentation offers a campus rule of thumb of 1–3 acres per megawatt of compute, plus 25% for linear infrastructure. It warns that associated wind or solar generation can add substantially more land. These are approximate planning benchmarks; they should not replace a project-specific design or be confused with a guarantee of compute performance. Industrial Asset, slide 18.

What information would help a community evaluate a proposed facility?

The ComputeFocus proposal calls for regular facility-level electricity use, water withdrawals and consumption, cooling type, and water source. These disclosures would make comparisons easier to check. Customer identities, proprietary workloads and sensitive operating details are outside the proposed public dataset. Read the ComputeFocus proposal.

3 responses to “Powering and Cooling the AI Boom in the United States”

  1. […] Revolution. But they are not built and operated in a vacuum. They need social license to operate. Concerns about power and water use are growing fast and have acquired enormous political salience. These can either be addressed broadly and proactively […]

  2. […] Powering and cooling the U.S. AI boom […]

  3. […] of a resilient energy transition and technological diversity in energy addition and transition. The September 2026 data center presentation applies related physical-system questions to AI […]